Friday, March 12, 2010

Day 2 installation complete



Every day this week it has either rained or snowed. Lots of humidity, which means the stain and poly coats will take longer to dry. The contractor left a series of stains for our consideration. We ended up choosing none of these, but a custom "golden oak" shade.



The stain goes on next and then 3 coats of polyurethane. One each day. So the second coat on Friday and then the third on Monday. We're really happy with the floors so far. It totally opens up the rooms to each other and makes the house feel so much larger.